Fișier:Kazakhstan's ancient geoglyphs schemes.jpg

Conținutul paginii nu este suportat în alte limbi.
De la Wikipedia, enciclopedia liberă

Mărește rezoluția imaginii(2.339 × 3.309 pixeli, mărime fișier: 405 KB, tip MIME: image/jpeg)

Acest fișier se află la Wikimedia Commons. Consultați pagina sa descriptivă acolo.

Descriere fișier

Descriere
English: Geoglyphs in the Kostanay region (Kazakhstan) have different shapes and sizes. The greatest attention is attracted to six objects. The Graphical representation of these objects allows to analyze the geometry and the orientation.
Dată
Sursă Operă proprie
Autor Conivsam

Geoglyphs in the Kostanay region were opened in 2007 by Dmitriy Dey [1]. Currently it is (supposedly) the oldest architectural monuments on the territory of Kazakhstan. Objects have different shapes and sizes. The greatest attention is attracted to six objects: the “Turgay triradial fylfot” Hill near Urpek (50°06'09.82"N, 65°21'40.90"E) - Overall dimensions: 95m x 95m (the Main Hill); the “Ushtogay's Square” hills complex (50°49'58.48"N, 65°19'34.70"E) - Overall dimensions: 387m x 394m; the “Ashtasti's Large cross” hills complex (50°13'39.62"N, 66°17'31.15"E) - Overall dimensions: 431m x 386m; the “Ekedyn's cross” hills complex (49°30'44.68"N, 65°51'44.09"E) - Overall dimensions: 249m x 229m; the “Kogai’s cross” hills complex (50°22'31.96"N, 65°27'43.98"E) - Overall dimensions: 280m x 212m; the “Amangel’dy’s cross” hills complex (50°10'8.00"N, 65°44'53.83"E) - Overall dimensions: 227m x 207m. The Graphical representation of these objects allows to analyze the geometry and the orientation. The most famous Kazakh geoglyphs have interesting geometric features File:The Kazakhstan's geoglyph "Turgay triradial fylfot" hills Complex and its geometric features.jpg, File:The Kazakhstan's geoglyph “Ashtasti's Large cross” hills Complex and its geometric features.jpg, File:The Kazakhstan's geoglyph “Kogai’s cross” hills Complex and its geometric features.jpg. The Calculation of earthwork excavation shows the fundamental possibility of the implementation figures in one season. The “Turgay triradial fylfot” Hill and other hill complex near Urpek: the number of different hills - 12; the average dimension of a hill - a total square of 5500 square meters, the height of 0,75 m; the bulk of earthwork 4125 cubic meters; the complexity of 8250 man-hours (the capacity of 0.5 cubic meters per hour) or a 1031 person-days (8 hours per day); the required number of diggers in the season (from May to September, 22 weeks, 132 working days) – 8. The “Ushtogay's Square” hills complex: the number of hills - 136; the average dimension of a hill - a diameter of 9,0 m, the height of 0,9 m; the bulk of earthwork 7783 cubic meters; the complexity of 15566 man-hours (the capacity of 0.5 cubic meters per hour) or a 1946 person-days (8 hours per day); the required number of diggers in the season (from May to September, 22 weeks, 132 working days) – 15. The “Ashtasti's Large cross” hills complex: the number of hills - 41; the average dimension of a hill - a diameter of 10,0 m, the height of 0,65 m; the bulk of earthwork 2092 cubic meters; the complexity of 4184 man-hours (the capacity of 0.5 cubic meters per hour) or a 523 person-days (8 hours per day); the required number of diggers in the season (from May to September, 22 weeks, 132 working days) – 4. The “Ekedyn's cross” hills complex: the number of hills - 28; the average dimension of a hill - a diameter of 9.0 m, the height of 0,65 m; the bulk of earthwork 1157 cubic meters; the complexity of 2314 man-hours (the capacity of 0.5 cubic meters per hour) or a 289 person-days (8 hours per day); the required number of diggers in the season (from May to September, 22 weeks, 132 working days) – 3. The “Kogai’s cross” hills complex: the number of hills – 22+5*; the average dimension of a hill - a diameter of 10,0 m, the height of 0,65 m; the bulk of earthwork 1378 cubic meters; the complexity of 2755 man-hours (the capacity of 0.5 cubic meters per hour) or a 344 person-days (8 hours per day); the required number of diggers in the season (from May to September, 22 weeks, 132 working days) – 3. The “Amangel’dy’s cross” hills complex: the number of hills - 20; the average dimension of a hill - a diameter of 12,0 m, the height of 0,65 m; the bulk of earthwork 1470 cubic meters; the complexity of 2939 man-hours (the capacity of 0.5 cubic meters per hour) or a 367 person-days (8 hours per day); the required number of diggers in the season (from May to September, 22 weeks, 132 working days) – 3.

Licențiere

Eu, deținătorul drepturilor de autor ale acestei opere, prin prezenta îmi public lucrarea sub următoarea licență:
w:ro:Creative Commons
atribuind partajând în condiții identice
Sunteți liber:
  • să partajați cu alții – aveți dreptul de a copia, distribui și transmite opera
  • să adaptați – aveți dreptul de a adapta opera
În următoarele condiții:
  • atribuind – Trebuie să atribuiți opera corespunzător, introducând o legătură către licență și indicând dacă ați făcut schimbări. Puteți face asta prin orice metodă rezonabilă, dar nu într-un fel care ar sugera faptul că persoana ce a licențiat conținutul v-ar susține sau ar aproba folosirea de către dumneavoastră a operei sale.
  • partajând în condiții identice – Dacă modificați, transformați sau creați pe baza acestei opere, trebuie să distribuiți opera rezultată doar sub aceeași licență sau sub o licență similară acesteia.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

subiectul reprezentat

13 octombrie 2016

Istoricul fișierului

Apăsați pe Data și ora pentru a vedea versiunea trimisă atunci.

Data și oraMiniaturăDimensiuniUtilizatorComentariu
actuală29 octombrie 2016 19:16Miniatură pentru versiunea din 29 octombrie 2016 19:162.339x3.309 (405 KB)ConivsamThe Additional object
23 octombrie 2016 20:38Miniatură pentru versiunea din 23 octombrie 2016 20:382.339x3.309 (375 KB)ConivsamUser created page with UploadWizard

Următoarele pagini conțin această imagine: